MENU

Regulatory Compliance and Pollution Prevention

PLUS Group complies with laws and regulations concerning the environment, along with other requirements that we have agreed upon. We create our own standards in addition to these as we endeavor to prevent pollution.

Emergency Simulations for industrial waste spill

PLUS holds an simulation drill every year for an emergency situation in which non-standard industrial waste is spilled in the Kanzawa River.
As with regular inspections and measurements, we define management procedures and responsibilities for implementation, and carry out the training to respond quickly to any emergencies that may occur in the processing of manufacturing wastewater.

  • Drill Orientation

  • Checking the position of the biotope pump, water level and shut-down system of the discharge pump

  • Checking discharge from the coagulative precipitation process and shut-down system of the raw water pump

PCB Management

PLUS has nine condensers and 49 fluorescent lighting stabilizers that use polychlorinated biphenyl. While they are stored and locked in the exclusive repository and stringently managed, further measures have been taken since March 2015 according to the Act on Special Measures concerning Promotion of Proper Treatment of PCB Waste.

PAGETOP